Staff Answer
Nov 25, 2025 - 01:11 PM
You should follow the recommended flash times for each product; typically 5–10 minutes between basecoat passes, 10–15 minutes for primer, and 15–20 minutes for clear coat, depending on temperature. To speed up drying safely, use gentle airflow or low-heat bake (not exceeding 120–140°F) and avoid direct high heat, which can trap solvents and cause defects like lifting, wrinkling, or solvent pop.
